It's happening... paperwork wise!
Our CSO sent an email yesterday wanting to confirm our tap positions and the shower niche was meant to be as per the diagrams and not what was in the contract as they are starting the work order process! Woohoo!
During this process we found out that we actually have 4 outdoor taps plus the garage tap. I know we added two taps to our contract and the garage one so that makes sense. I suspect the master diagram only had one outdoor tap drawn in so we added two to get three but by default there is two so adding two makes 4. It makes sense in my head now! At $40 a pop we decided to add another one near the garage under where the meter box is going.
And she had ordered a site inspection by the site supervisor to make sure everything was in order before they go on site.
I'm hoping that means that we are close to having something start!
During this process we found out that we actually have 4 outdoor taps plus the garage tap. I know we added two taps to our contract and the garage one so that makes sense. I suspect the master diagram only had one outdoor tap drawn in so we added two to get three but by default there is two so adding two makes 4. It makes sense in my head now! At $40 a pop we decided to add another one near the garage under where the meter box is going.
And she had ordered a site inspection by the site supervisor to make sure everything was in order before they go on site.
I'm hoping that means that we are close to having something start!
Comments
Post a Comment